Recently completed in Plymouth England the first 40 metre Superyacht from Princess Yachts.

This 52 foot vessel was totally re-seamed. The old caulking was 100% removed and replaced with sis 440 supplied by Teakdecking Systems. Probably the best caulking ever developed and is present in many of the worlds finest Yachts.

Shipbuilding methods have changed over the years and shorter build times demand good planning and accurate and quick methods of installing. This 92 metre yacht constructed in steel and aluminium to a very high German standard.

Choose a professional company when undertaking such projects. Do not let dayworkers and cowboys ruin your yacht.

35 years as a professional shipwright and more completed projects than most.
Nothing is more important than preparation of the sub deck and fairing prior to the installation of new teak decking.

Many installations fail because of poor preparation. An irregular surface can cause voids between the teak and the fairing compound resulting in the presence of moisture and premature loss of the new deck.
  • Effet du soleil
  • Eden
  • Snail on the Corn
  • Flowers
  • Alone Beach

Recently completed in Plymouth England the first 40 metre Superyacht from Princess Yachts. Compass Marine Decking Ltd was entrusted to install the teak decking on the latest and most...

Shipbuilding methods have changed over the years and shorter build times demand good planning and accurate and quick methods of installing. This 92 metre yacht constructed in...

Nothing is more important than preparation of the sub deck and fairing prior to the installation of new teak decking. Many installations fail because of poor preparation. An irregular...

Some more beautiful examples of how a superyacht deck should look when installed by professionals...

This 52 foot vessel was totally re-seamed. The old caulking was 100% removed and replaced with sis 440 supplied by Teakdecking Systems. Probably the best caulking ever...

Re-seams on larger yachts require a great deal of planning and close coordination with other trades such as the paint crew. Compass marine Decking has completed...

This stunning project was undertaken in The Netherlands and shows the superb quality demanded in Dutch yards. Only skilled shipwrights with many years experience...

This stunning 92m vessel was totally restored to her former glory . The teak deck was hand laid using exceptionally high quality wood. Every effort was made to copy the original...

Why Choose Us

The company (CMD) was formed on January 1st 2009. The current director of CMD is Paul Haddy who had worked for Teakdecking Systems for 17 years as their European Manager. During his time at TDS he was responsible for new deck installation on some of the world's largest yachts in some of the best German, Dutch, Spanish and English shipyards.

Contact Us

Phone: +44 (0)7706 916 712

Email: Paul@CompassMarineDecking.Co.Uk
Compass Marine Decking Ltd, 10 Compass House,
Mariners Court, Plymouth. Pl4 0BT . England